Construction begins on new hydroelectric power plant in Northern Samar

inquirer.net November 12, 2024, 07:01 AM UTC

A new 3.18-megawatt hydroelectric power plant has begun construction in Barangay Happy Valley, San Isidro, Northern Samar. The project, a partnership between EBATECH and the Northern Samar Electric Cooperative, aims to enhance the region's renewable energy capacity. The facility is expected to be operational by 2028, using the Mawo River for electricity generation. It will integrate into the local distribution system, potentially lowering power rates for consumers by 0.4482 pesos per kilowatt-hour. EBATECH plans to support the local community with initiatives like a daycare center and infrastructure improvements. The provincial government holds a 20 percent stake in the project, reflecting its commitment to sustainable development.


With a significance score of 2.7, this news ranks in the top 27% of today's 18299 analyzed articles.

Get summaries of news with significance over 5.5 (usually ~10 stories per week). Read by 8000 minimalists.