Fukushima nuclear debris removal operation officially begins
RTÉ News — September 10, 2024, 07:00 AM UTC
Summary: Tokyo Electric Power Company (TEPCO) has commenced the removal of radioactive debris from the Fukushima nuclear plant, following a delay due to technical issues. The pilot operation aims to extract three grams of debris for analysis, part of a larger effort to decommission the site, where 880 tons of hazardous material remain. The Fukushima disaster occurred in March 2011 after a tsunami triggered reactor meltdowns.
Article metrics
The article metrics are deprecated.
I'm replacing the original 8-factor scoring system with a new and improved one. It doesn't use the original factors and gives much better significance scores.