Kukrail river project halts sewage flow from 17 drains in Lucknow

hindustantimes.com November 23, 2024, 05:01 PM UTC

The Kukrail river interception and diversion project has been completed, stopping untreated sewage from 17 drains. The ₹67.65 crore initiative includes a 6 km sewer line directing sewage to a treatment plant. Lucknow Municipal Commissioner Inderjit Singh confirmed the project's success, stating that untreated sewage flow into the river has been completely halted. Officials plan to implement similar projects to manage sewage from other city drains, aiming to improve urban water management and environmental protection.


With a significance score of 3.4, this news ranks in the top 14% of today's 18070 analyzed articles.

Get summaries of news with significance over 5.5 (usually ~10 stories per week). Read by 8000 minimalists.