Robot starts removing melted fuel at Fukushima plant

thehindu.com

A robot began a two-week mission on September 10, 2024, to retrieve melted fuel debris from the Fukushima nuclear plant's Unit 2 reactor, marking the first such attempt since the 2011 disaster. An estimated 880 tons of radioactive material remain in three reactors. Decommissioning is projected to take 30-100 years, with challenges including high radiation levels and complex debris conditions.


With a significance score of 5.9, this news ranks in the top 0.3% of today's 27288 analyzed articles.

Get summaries of news with significance over 5.5 (usually ~10 stories per week). Read by 10,000+ subscribers:


Robot starts removing melted fuel at Fukushima plant | News Minimalist