Robot starts retrieving melted fuel at Fukushima plant

The Associated Press September 10, 2024, 07:00 AM UTC

A robot has begun a two-week mission to retrieve melted fuel debris from the Fukushima nuclear plant's Unit 2 reactor, marking the first attempt to collect such material since the 2011 disaster. An estimated 880 tons of molten fuel remains across three reactors. The decommissioning process is expected to take 30-100 years, with significant challenges ahead in safely removing and storing the radioactive material.


With a significance score of 5.2, this news ranks in the top 1% of today's 14484 analyzed articles.

Get summaries of news with significance over 5.5 (usually ~10 stories per week). Read by 8000 minimalists.