Wind Peak starts transporting turbines to Dogger Bank

bbc.com

The Wind Peak has arrived in Hull to transport wind turbine components to the Dogger Bank wind farm, located 80 miles off East Yorkshire. This vessel is 162 meters long and can carry seven turbine sets per trip. Officials announced that the first turbines will be installed in the coming weeks, marking a significant step for RWE's largest offshore project.


With a significance score of 2.8, this news ranks in the top 26% of today's 18453 analyzed articles.

Get summaries of news with significance over 5.5 (usually ~10 stories per week). Read by 9000 minimalists.


loading...